Bottom Mount

Bottom mounting:
In this case, the pulley box is positioned under the door. The cable running underneath the lower part allows eliminating the aesthetic impact, also thanks to the side guards (281.11). This type of assembly allows installing more than two gates. and the T gate profile dimensions (min. 60 mm, max. 120 mm).

This kit consists of:
  • 2 x galvanized adjustable pulley box for cable (282.411/282.511)
  • 10 m of 4 mm steel cable
  • plates for connection (between the two gates and ground fixing)
  • 30 mm rollers between the two gates
  • Cable covers for bottom mounting (1200 mm  in length each) 281.11
  • Guide track for 30 mm rollers between the two gates (3000 mm each in length) 283.303
  • Caps for guide track 283.013
* Please note that for bottom mounting you need to use wheels of minimum 120 mm diameter.


Product number: 280.B30
Price: POA (excl. GST)


FLEXIBLE APPLICATIONS IN COMPACT SPACES, AND MORE!



Click below to watch the tutorial video created to facilitate installation operations...


Telescopic Tutorial

MADE IN ITALY